I-65 lane closures near Shelby/Chilton county line

SHELBY COUNTY, AL (WBRC)

ALDOT announces the following lane closures of I-65 North between the Shelby/Chilton county line (MP 226) and the I-65/U.S. 31 interchange in Alabaster (MP 238):

Weather permitting, the Alabama Department of Transportation announces at various times the inside lane, outside lane and shoulders will be closed to perform paving operations on Interstate 65 in Shelby County on the following dates and times:

  • Monday,  October 24 at 7 p.m. until Tuesday, October 25 at 6 a.m., northbound from (milepost 232) to ( milepost 234);
  • Tuesday, October 25  at 7 p.m. until Wednesday, October 26  at 6 a.m., northbound from (milepost 226) to ( milepost 230);
  • Wednesday, October 26 at 7 p.m. until Thursday, October 27 at 6 a.m., northbound from (milepost 228) to (milepost 232);
  • Thursday, October 27 at 7 p.m. until Friday, October 28  at 6 a.m., northbound from (milepost 230) to (milepost 234); and
  • Friday, October 28 at 8 p.m. until Saturday, October  29 at 9 a.m., northbound from (milepost 232) to (milepost 236).

Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this construction operation to improve Alabama's roadways.

For additional road closure information, visit www.dot.state.al.us.